#789 Shepard & Extension

The Drain Commissioner is assessing $20,500 over 1 year. 

The #789 Shepard & Extension was last assessed in 2015. 


Work Completed

• Inspection for brush spraying in 2016

• Log removal from bridge crossings in 2016

• Inspection of downstream portion of the drain in 2017

• Fallen tree removal in 2019 (Lloyd’s Excavating)

• Problem report of erosion in 2020

• Fallen tree removal in 2020 (Lloyd’s Excavating)

• Cleanout and realignment work in 2021 (Lloyd’s Excavating)

• Removal of trees/logs at CIS Trail bridge in 2022

• Brush spraying in 2022 (Stoney Creek Outdoor)

• Problem Report response in 2023, tree down

• Removal of trees/logs at CIS Trail bridge in 2023 (Wombat Services)