Occupancy Requirements
Building
Electrical, Mechanical and Plumbing permit final inspections must be approved.
Site address installed per the 911 ordinances.
The grade away from the foundation shall fall a minimum of 6 inches within the first 10 feet from the foundation.
Required steps, handrails, guardrails and landings shall be installed.
All smoke detectors shall be operational.
Final building inspection approval and all re-inspection fees, if any, shall be paid.
Electrical
Breaker panel directory must be complete in detail and accuracy.
All electrical installation must be completed including all covers, plates and caps for safety from shock.
All light fixtures with bulbs; need to be installed for testing.
Mechanical
A Mechanical permit secured by a licensed contractor for propane gas must pass its final inspection.
Furnace, ductwork and register grills must be installed. Any fireplaces must be operable.
Plumbing
All plumbing fixtures must be installed and working.
Final septic and water approvals by the appropriate health department.
Forms Center
Fee Schedule
Soil Erosion & Sedimentation Control
Fee Schedule
Soil Erosion & Sedimentation Control (SESC) Ordinance
Soil Erosion & Sedimentation Control (SESC) User Guide
Frequently Asked Questions
Occupancy Requirements
Construction Board of Appeals
Agendas & Minutes
Sign up for Alerts
Online Services
Employment
Online Mapping
Sheriff's Office
Government Websites by
CivicPlus®
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow