The Drain Commissioner is assessing $5,000 over 1 year.
The #964 Meadowbrook was last assessed in 2016.
Work Completed
• Inspection of outlet structure in 2017
• Problem report response and catch basin repair in 2018
• Inspection after heavy rain event in 2019
• Tree removal work in detention basin in 2020
• Problem report response in 2021
• Obstruction removal in outlet structure in 2021
• Meeting regarding Lake Lansing in 2022
• Problem report response – filling of west detention basin in 2022
• Detention basin maintenance in 2023