|
Disturbed
areas must be seeded within five calendar days of achieving final
grade or within 30 calendar days of substantial completion of the
exterior of the building. (MDOT Rule 1709)
Maintenance
responsibilities for SESC measures are a responsibility of both
the landowner and builder during construction. Continued
maintenance of permanent control measurers shall be the responsibility
of the property owner and shall become a part of any legal exchange.
A Permit
Transfer Form must be completed upon ownership transfer.
Construction
scheduling and practices may need to be altered in order to permanently
stabilize a site within the permitted time frame.
New
permits issued will expire one year after issued.
An
SESC permit must be extended if a site cannot be permanently stabilized
before its permit expires. If a permit is not extended, the
coverage will terminate when the permit expires, and all outside
work must cease. A new permit application must be submitted
with appropriate fees and sureties.
Please
contact the County Enforcing Agent to schedule final inspections
at (989) 227-6442. Random inspections will also be conducted
during construction to assure steps are being taken to minimize
soil erosion and to eliminate off site sedimentation.
|