Timing Requirements

Skip Nav About | Documents | Site Map |  Print  Print   |
Font Size
  Search
  • Home
    • Documents Center
    • Events Calendar
  • Dashboard
  • Government
    • Board of Commissioners
    • County Clerk
    • Drain Commissioner
    • Register of Deeds
    • Treasurer
  • Departments
    • Administration - Accounting
    • Building Department
    • Community Development-Planning & Zoning
    • Dept. of Public Works
    • Equalization
    • Maintenance
    • MIS/GIS
    • MSU Extension
    • Parks and Green Space Commission
    • Department of Waste Management Home Page
  • Law & Justice
    • Circuit Court
    • Central Dispatch 911
    • 65A District Court
    • Friend of the Court
    • Juvenile Court
    • Probate Court
    • Prosecuting Attorney
    • Sheriff Office
  • Online Services
  • Resources
    • Apportionment Commission
    • Chamber of Commerce
    • Clinton Conservation District
    • Clinton Transit System (CATS)
    • County Directory
    • Economic Alliance
    • Health Department
    • Historical Society
    • Homeowner Assistance
    • Links
    • MSU Extension
    • Policies and Procedures
    • Recycling
    • Road Commission
    • Prescription Drug Card Program
    • Veteran's Services
    • Manage News Subscriptions
  • Contact List
  • Board of Commissioners
  • County Clerk
  • Drain Commissioner
    • Annual Reports
    • Assessments
    • Brush Control
    • Current Projects
    • Drain Problem
    • Drain Use Permits/Culvert Sizing
    • Municipal Liability
    • Petition Process
    • Right-of-Way or Easements
    • Soil Erosion
      • Fee Schedule
      • Home Owners Guide
      • Silt Fence Installation
      • Site Requirements
      • Timing Requirements
    • Special Drain Assessments FAQ'S
    • Township Maps
  • Register of Deeds
  • Treasurer
Timing Requirements
Government » Drain Commissioner » Soil Erosion » Timing Requirements

Disturbed areas must be seeded within five calendar days of achieving final grade or within 30 calendar days of substantial completion of the exterior of the building.   (MDOT Rule 1709)

 

Maintenance responsibilities for SESC measures are a responsibility of both the landowner and builder during construction.   Continued maintenance of permanent control measurers shall be the responsibility of the property owner and shall become a part of any legal exchange.   A Permit Transfer Form must be completed upon ownership transfer.

 

Construction scheduling and practices may need to be altered in order to permanently stabilize a site within the permitted time frame.

 

New residential permits will expire six months after issue date.

 

An SESC permit must be extended if a site cannot be permanently stabilized before its permit expires.   If a permit is not extended, the coverage will terminate when the permit expires, and all outside work must cease.   A new permit application must be submitted with appropriate fees and sureties.

 

Please contact the County Enforcing Agent to schedule final inspections at (989) 227-6442.   Random inspections will also be conducted during construction to assure steps are being taken to minimize soil erosion and to eliminate off site sedimentation.

Soil Erosion Links

LinkIcon Homeowners Guide
LinkIcon Permit Fees
LinkIcon Silt Fence Installation
LinkIcon Site Requirements
LinkIcon Soil Erosion and Sedimentation Ordinance
LinkIcon Timing Requirements
© 2012 Clinton County, Michigan
Privacy & Disclaimer   Login
  • Home
  • Dashboard
  • Government
  • Departments
  • Law & Justice
  • Online Services
  • Resources
  • Contact List