Site Requirements

Skip Nav About | Documents | Site Map |  Print  Print   |
Font Size
  Search
  • Home
    • Documents Center
    • Events Calendar
  • Dashboard
  • Government
    • Board of Commissioners
    • County Clerk
    • Drain Commissioner
    • Register of Deeds
    • Treasurer
  • Departments
    • Administration - Accounting
    • Building Department
    • Community Development-Planning & Zoning
    • Dept. of Public Works
    • Equalization
    • Maintenance
    • MIS/GIS
    • MSU Extension
    • Parks and Green Space Commission
    • Department of Waste Management Home Page
  • Law & Justice
    • Circuit Court
    • Central Dispatch 911
    • 65A District Court
    • Friend of the Court
    • Juvenile Court
    • Probate Court
    • Prosecuting Attorney
    • Sheriff Office
  • Online Services
  • Resources
    • Apportionment Commission
    • Chamber of Commerce
    • Clinton Conservation District
    • Clinton Transit System (CATS)
    • County Directory
    • Economic Alliance
    • Health Department
    • Historical Society
    • Homeowner Assistance
    • Links
    • MSU Extension
    • Policies and Procedures
    • Recycling
    • Road Commission
    • Prescription Drug Card Program
    • Veteran's Services
    • Manage News Subscriptions
  • Contact List
  • Board of Commissioners
  • County Clerk
  • Drain Commissioner
    • Annual Reports
    • Assessments
    • Brush Control
    • Current Projects
    • Drain Problem
    • Drain Use Permits/Culvert Sizing
    • Municipal Liability
    • Petition Process
    • Right-of-Way or Easements
    • Soil Erosion
      • Fee Schedule
      • Home Owners Guide
      • Silt Fence Installation
      • Site Requirements
      • Timing Requirements
    • Special Drain Assessments FAQ'S
    • Township Maps
  • Register of Deeds
  • Treasurer
Site Requirements
Government » Drain Commissioner » Soil Erosion » Site Requirements

Silt Fence

  • Install before land is disturbed.
  • Install on down slope side of site parallel to contour of the land.
  • Extended ends up slope enough to allow water to pond behind fence .
  • Bury 8 inches of fabric in trench
  • Leave no gaps.   Overlap sections of silt fence, or twist ends of silt fence together.
  • Inspect and repair once a week and after every rain.  Remove sediment if deposits reach half the fence height.
  • Maintain until a lawn is established.

Soil Piles

  • Locate away from any downslope street, driveway, stream, lake, wetland, ditch or drainage way.
  • Temporary seed such as Cereal Rye or Seed Oats is required for topsoil piles.

Access Drive

  • Install an access drive using 2-3 inch crushed rock, limestone or clean concrete prior to placing the first floor decking on foundation.   Road gravel is ineffective and will not be allowed.
  • Lay stone at least 6 inches deep and at least twelve feet wide, beginning at the street and extending into lot at least 50 feet.  
  • Maintain throughout construction.
  • In clayey or loamy soils, place geotextile fabric under the stone to reduce heaving.
  • This rock entrance should serve as a sub base for finished drive, if installed correctly.

Sediment Cleanup (Required)

  • At the end of each workday, sweep or scrape up soil tracked onto the road. By the end of the next calendar day after a storm, cleanup soil washed off site.

Sewer Inlet Protection (Required)

  • Protect on site storm sewer inlets with drop inlet protection, silt fences or equivalent measures.
  • Inspect, repair and remove sediment deposits after every storm.

Preserving Existing Vegetation

  • Wherever possible, preserve existing trees, shrubs, and other vegetation.
  • To prevent root damage, do not grade, place soil piles, or park vehicles near trees marked for preservation.
  • Place plastic mesh or snow fence barriers around trees to protect the area below their branches.

Re-vegetation (Required)

  • Seed, sod, or mulch bare soil as soon as possible .   Vegetation is the most effective way to control erosion.

Soil Erosion Links

LinkIcon Homeowners Guide
LinkIcon Permit Fees
LinkIcon Silt Fence Installation
LinkIcon Site Requirements
LinkIcon Soil Erosion and Sedimentation Ordinance
LinkIcon Timing Requirements
© 2012 Clinton County, Michigan
Privacy & Disclaimer   Login
  • Home
  • Dashboard
  • Government
  • Departments
  • Law & Justice
  • Online Services
  • Resources
  • Contact List